84
EN
9.3 Inspection
(Carried out by the operator in accordance with
EN 806-5)
Inspection activities Interval Note for products
WITHOUT active BWT
DES registration
Note for products
WITH active BWT DES
registration
Check/rellregenerative
According
to use
Required Required
Check brine containers for
soiling
Every 2
months
Required Required
Check for leaks, visual
inspection
Every 2
months
Required Required
Functional test/control unit
display
Every 2
months
Required Not required
Test regenerative consump-
tion depending on the treated
water
Every 2
months
Required Not required
Check the setting of the
regeneration waste water
system
Every 2
months
Required Required
Check the counting function
of the water meter
Every 2
months
Required Not required
Test the regeneration process
Every 2
months
Required Not required
Clean the brine container
and the internal surfaces that
come into contact with water
Every 6
months
Required Required