Installing the RTU Open
RTU Open v3 CARRIER CORPORATION ©2019
Installation and Start-up Guide All rights reserved
5
To install the RTU Open:
1 Mount the controller (page 6).
2 Wire the controller for power (page 7).
To use the rooftop equipment control power transformer (page 8).
To use an auxiliary control power transformer (page 9).
3 Set the controller's address (page 11).
4 Set the protocol and baud rate (page 11).
5 Wire to the BACnet MS/TP or BACnet ARC156 network (page 12, page 12).
6 Wire inputs and outputs (page 13).
7 Wire sensors to the controller (page 20).
Field-supplied hardware
An RTU Open retrofit installation may require the following field-supplied components:
wiring harness: Part #OPN-RTUHRN
transformer 24 Vac, 20 VA minimum
wiring
Application-dependent components
:
carbon dioxide sensors
damper/damper actuator
differential pressure switch
enthalpy switch
fan status switch
door switch
fan section door switch
relative humidity sensor
remote occupancy contact
smoke detector
temperature sensors
Installing the RTU Open

Table of Contents

Other manuals for Carrier RTU Open v3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Carrier RTU Open v3 and is the answer not in the manual?

Carrier RTU Open v3 Specifications

General IconGeneral
BrandCarrier
ModelRTU Open v3
CategoryController
LanguageEnglish

Related product manuals