Installing the RTU Open
   
 
 
 
RTU Open v3    CARRIER CORPORATION ©2019  
Installation and Start-up Guide    All rights reserved 
  5 
 
To install the RTU Open: 
1  Mount the controller (page 6).  
2  Wire the controller for power (page 7). 
○  To use the rooftop equipment control power transformer (page 8). 
○  To use an auxiliary control power transformer (page 9). 
3  Set the controller's address (page 11). 
4  Set the protocol and baud rate (page 11). 
5  Wire to the BACnet MS/TP or BACnet ARC156 network (page 12, page 12). 
6  Wire inputs and outputs (page 13). 
7  Wire sensors to the controller (page 20).  
 
 
 
 
 An RTU Open retrofit installation may require the following field-supplied components: 
•  wiring harness: Part #OPN-RTUHRN 
•  transformer – 24 Vac, 20 VA minimum 
•  wiring 
 
Application-dependent components
 
•  carbon dioxide sensors  
•  damper/damper actuator  
•  differential pressure switch 
•  enthalpy switch 
•  fan status switch 
•  door switch 
•  fan section door switch 
•  relative humidity sensor 
•  remote occupancy contact 
•  smoke detector 
•  temperature sensors