26
Example: SPP Equipment Summary Screen
A13121
6.2. Installation
Touch INSTALLATION to perform the start--up process in order to learn all
equipment in system. Touch NEXT to initiate the process.
Touch Airflow Verification Test to perform a duct assessment. This can be done if
duct modifications have been made since installation of the Infinity
®
Touch wall
control. Duct assessment can be performed without performing a full system install.
A14222
NOTE: For Small Packaged Products (SPP), please use the following instructions
for Set--up (Section 6.3), Checkout (Section 6.4), and Service (Section 6.5):
--For PAC AC Indoor and OAC HP Indoor, follow Fan Coil instructions.
--For Gas PAC Indoor and Gas PHP Indoor, follow Furnace instructions.