EasyManua.ls Logo

CASE CONSTRUCTION CX26C - Page 227

Default Icon
258 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9-ACCESSORIES
Operationwiththehydraulicbreaker
Thehydraulicbreakerisasingle-actinghydraulicattachment,andshallbeconnectedtotherstauxiliary(1-way)
hydrauliccircuit.
Therefore,tooperatewithahydraulicbreakerthemachineshallbeequippedwiththerstauxiliary(1-way)hydraulic
circuit.
Aftermakingsurereadandunderstandtheinstallation
proceduredescribedintheOperatorsmanualofthe
attachmentproceedasfollows:
1.Makesurethatthemachineandtheattachmenttobe
installedareonatandlevelground.
2.Operatethecontrolsofboom,armandbucketinorder
toinstallthehydraulicbreakertothebucketlinkageat
thetopofthearm.
3.Stoptheengine.Releasepressureinsidetherstaux-
iliary(1-way)hydrauliccircuitasinstructedin6-11.
4.Closethestopvalvesatthetopofthearm.Install
theconnectinghosesbetweentheattachmentandthe
stopvalves.
NOTICE:makesuretoidentifyonthebreakerthesup-
plyport(INorP)andthereturnporttotank(OUTor
T).Thehoseforbreakersupplyshallalwaysbecon-
nectedtothestopvalveontheleftsideofthearm.If
thesupplyportonthebreakerisnotalignedtothestop
valveontheleftsideofthearm,checkforanalterna-
tivesetupofthehydraulicportsontheattachment.
NOTICE:alwayskeepeachconnectinghoseonthe
samesideofthearm.Nevercross-overtheconnect-
inghosesbetweenthetwosidesofthearm.
5.Openthestopvalvesandcheckthexingclampsfor
looseness,andthetubesandhosesttingsforleaks.
6.Starttheengine.Operatethecontrolsofboom,arm
andbucketinordertopositionthebreakerrighttothe
structureortotheobjecttobecrushed.
9-11

Table of Contents

Related product manuals