4
CMK
The station’s CMK box contains:
• The Cable Management Kit (CMK)
• Pre-installed EV Charging Only sign
• Cable clamps (2)
Top Cap
The station’s top cap box contains:
• Top cap
• Installation Guide
If installing both pedestal and wall-mount stations, also pay
attention to the top cap’s shape.
• The back of the top cap is rounded for pedestal stations
• The back of the top cap is flat for wall mount stations
Head Assembly
The station’s head assembly box contains:
• T25 security Torx L-wrench
• Rubber plugs (4)
• Spare activation label
Note: Keep the activation label for future reference. It
contains critical information that is needed to activate the
station on ChargePoint. You will also have 2 spare rubber
plugs at the end of installation. Plan to return the spare
activation label and rubber plugs to the station owner.