IMPORTANT SAFETY INSTRUCTIONS

General Safety Warnings

Read and follow all warnings and instructions before installation and operation to prevent injury or damage.

Product Disposal and Accuracy

Information on proper product disposal and disclaimers about manual accuracy.

Introduction to ChargePoint CT4000

Installer and Site Requirements

Mandatory installer approval and site preparation checks for CT4000 installation.

Power Management Overview

Explanation of ChargePoint's Power Management technology for managing station load.

Local Code Compliance

Install a Pedestal Mount CT4000

Pedestal Mount Preparation and Components

Gathering tools and inspecting contents for pedestal mount installation.

Prepare and Mount the Pedestal

Steps to prepare the pedestal for mounting and secure it to the base.

Alternative Conduit Installation

Instructions for installing conduit when it cannot come up from below the pedestal.

Install Pedestal Housing

Steps for fitting and securing the main housing unit onto the pedestal.

Prepare CMK for Pedestal Mount

Preparing the Cable Management Kit for installation on the pedestal.

Install CMK on Pedestal

Securing the Cable Management Kit to the pedestal housing.

Install a Wall Mount CT4000

Wall Mount Preparation and Components

Gathering tools and inspecting contents for wall mount installation.

Wall Mount Bracket Installation

Drilling holes and mounting brackets to the wall for the station.

Prepare CMK for Wall Mount

Preparing the Cable Management Kit for installation on the wall mount.

Mount CMK and Install Housing

Securing the CMK and fitting the housing onto the wall mount brackets.

Install Conduit for Wall Mount

Steps for removing knockouts and installing conduit into the housing.

Wiring and Electrical Connections

Electrical Specifications and Diagrams

Reviewing electrical input/output and wiring diagrams for proper connection.

Wire Dual or Single Port Stations

Detailed steps for connecting wires to the terminal blocks for both station types.

Check Input Voltages

Procedure for verifying correct input voltages at the terminal block.

Head Assembly and Top Cap Installation

Prepare and Connect Head Assembly

Assembling the top cap and connecting the head assembly to the station.

Complete Station Setup and Testing

Initial Power Up and Cable Clamps

Powering up the station and installing cable management clamps.

Run Installation Wizard and Secure Head

Using the wizard for setup and securing the head assembly post-wiring.

Pinpoint Station Location

Using a smartphone app or mobile site to register the station's precise location.

Start Test Charging Session

Performing a test charge to verify station functionality.

Post-Installation Checklist

Checklist to ensure all installation steps and requirements are met before completion.

Warranty and Liability Information

Warranty Disclaimer and Liability

Details on warranty exclusions, disclaimers, and limitations of liability.

ChargePoint CT4000 Specifications

General IconGeneral
ModelCT4000
Connector TypeSAE J1772
Voltage208-240 VAC
Amperage30A
DisplayLCD
Connectors per Station1 or 2
Enclosure RatingNEMA 3R
AuthenticationRFID, Mobile App
Cable Length18 feet
Ingress Protection RatingIP54
CategoryElectric Vehicle Charging Station
Output Power7.2 kW
Network ConnectivityWiFi, Ethernet, Cellular
Mounting OptionsWall, Pedestal
Operating Temperature-30°C to 50°C
Warranty3 years