Chore-Tronics® 2 Control Control Installation
MT1843B
75
To route the Static Pressure Hoses into the Chore-Tronics
®
2 Main Box, first drill
two 5/8" holes in the side of the Chore-Tronics
®
2 Main box next to the sensor. Place
a ½" water tight connector (Item 3, Figure 86) into each hole and tighten using the
hardware provided. Then route a 3/16" ID hose (Chore-Time part number 43071)
through each of the water tight connectors. Connect one hose to the low pressure barb
on the SP module. Then run that house into the house. Connect another hose to the
high pressure barb on the sp module. Run that hose into the attic or to outside air.
Make sure the high pressure hose is in still air. Once the hoses have been routed and
connected, place the barb reducer plugs into the end of the hose opposite of the SP
sensor.
2
1
3
4
Item Description
1 Static Pressure Sensor
2 Static Pressure Hose
3 1/2" Water Tight Connector
4 Barb Reducer Plugs
Figure 86. Static Pressure Sensor Hose Routing
Low Pressure Barb
High Pressure Barb
Run into Attic
Run into House

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Chore-Tronics 2 Control and is the answer not in the manual?

Chore-Tronics 2 Control Specifications

General IconGeneral
BrandChore-Tronics
Model2 Control
CategoryControl Unit
LanguageEnglish