CHAPTER
3
3-1
SEQUENCE OF OPERATION • • • • • • • • • • • • • • • • • • •
3-1
CHAPTER
4
A General
3--1
B.
c.
D.
Circuit and Interlock Controls
3--6
Sequence
of
Operation - Oil
Or
Gas 3-7
Flame
Loss Sequence 3-9
STARTING
AND
OPERATING INSTRUCTIONS • • • • • • • • •
4-1
CHAPTER
5
A General Preparation
For
Start-Up -
AJI
Fuels
B.
ControiSe~ngs-
Steam And
Hot
Water
C.
Gas Pilot
4-1
4-2
4-3
D.
Atomizing Air 4-4
E.
Firing Preparations for No. 2 Oil
(Sseries
1 00-200) 4-5
F.
Firing
Preparati~n
For No. 6 Oil
(Series 400-600)
4-6
G. Firing Preparations For
gas
(Series 200-400-700) 4-8
H.
Start-up, Operating and Shutdown
-
AJI
Fuels 4-9
I.
Control Operational Test and Checks
4-11
5-1
ADJUSTMENT PROCEDURES
• • • • • • • • • • • • • • • • • .
5-1
A
Gene
raJ
5-2
B.
Unkage-Modulating
Motor
and Air Damper
5-3
c.
Modulating Motor
5-4
D.
Modulating Motor Switches -
Low Fire and High Fire
5-5
E.
Burner Operating Controls - General 5-5
F.
Modulating Pressure Control (Steam) 5-7
G.
Operating
Umit
Pressure Control
(Steam)
5-8
H.
High
Umit
Pressure Control (Steam)
5-8