Mains Input Cover Installation
๎1.๎ Ensure๎that๎no๎residue๎remains๎on๎the๎contact๎surfaces๎of๎Mains๎Input๎Cover๎and๎Top๎Cover.
๎2.๎ Place๎the๎Mains๎Input๎Cover๎and๎secure๎it๎with๎the๎M5x15๎fasteners.๎Tighten๎according๎to๎the๎sequence๎
shown๎in๎Figure๎4-7๎๎Mains๎Input๎Cover๎Torque๎Sequence.
Figure 4-7 Mains Input Cover Torque Sequence
๎3.๎ Follow๎the๎sequence๎twice.๎The๎first๎time,๎only๎tighten๎the๎fasteners๎halfway๎down๎to๎allow๎for๎
adjustment.๎Tighten๎the๎#๎4๎fastener๎only๎once๎and๎be๎sure๎to๎not๎overtighten.๎Torque๎to๎13๎in.lb.๎on๎
the๎second๎pass.
๎4.๎ Return๎the๎compressor๎to๎normal๎operation.
4.1.2 Top Cover
๎
4.1.2.1 Top Cover Removal and Installation
Top Cover Removal
๎1.๎ Isolate๎compressor๎power๎as๎described๎in๎Section๎1.8๎๎Electrical๎Isolation๎on๎page๎22.
๎2.๎ Remove๎the๎Mains๎Input๎Cover๎by๎releasing๎the๎M5x15๎fasteners.
๎3.๎ Remove๎the๎Mains๎Input๎cover.
๎4.๎ Remove๎the๎M5x15๎fasteners๎that๎secure๎the๎Top๎Cover๎and๎remove๎the๎cover.
Top Cover Installation
๎1.๎ Ensure๎that๎no๎residue๎remains๎on๎the๎contact๎surfaces๎of๎Top๎Cover๎and๎casting๎sides.
๎2.๎ Place๎the๎Top๎Cover๎and๎secure๎it๎with๎the๎M5x15๎fasteners๎according๎to๎the๎sequence๎shown๎in๎Figure๎
4-8๎๎Top๎Cover๎Torque๎Sequence๎on๎page๎54.๎Follow๎the๎sequence๎twice.๎The๎first๎time,๎only๎tighten๎the๎
fasteners๎halfway๎down๎to๎allow๎for๎adjustments.๎Torque๎to๎13๎in.lb.๎on๎the๎second๎pass.๎
๎
M-SV-001-EN Rev. H-1/23/2023 Page 53 of 294