4.8.1
4.8.2
4.8.3
4.8.4
4.8.4.1
4.8.5
4.8.6
4.8.7
4.8.8
4.9
5
5.1
5.2
5.2.1
5.2.2
5.2.3
5.2.4
5.2.5
5.2.5.1
5.2.6
5.2.6.1
5.2.6.2
5.3
5.3.1
5.3.2
5.3.3
5.3.3.1
5.3.3.2
5.3.4
5.3.4.1
5.3.4.2
5.3.4.3
5.3.4.4
5.3.4.5
5.3.5
5.3.6
5.3.6.1
Control Wiring 31
Control Terminal Types 31
Terminal Descriptions 32
Wiring to Control Terminals 33
Removing a Control Wire 34
Enabling Motor Operation (Terminal 27) 34
Voltage/Current Input Selection (Switches) 34
Safe Torque Off (STO) 35
RS485 Serial Communication 35
Installation Check List 35
Commissioning 37
Applying Power 37
Local Control Panel Operation 37
Local Control Panel 37
LCP Layout 37
Parameter Settings 40
Uploading/Downloading Data to/from the LCP 40
Changing Parameter Settings 40
View Changes 40
Restoring Default Settings 40
Recommended Initialization 41
Manual Initialization 41
Basic Programming 41
Commissioning with SmartStart 41
Commissioning via [Main Menu] 41
Asynchronous Motor Setup 42
Application-specific Adjustment when Running VVC+ 43
Application-specific Adjustment when Running Flux 43
Permanent Magnet Motor Set-up 43
Initial Programming 43
Programming Motor Data 44
Test Motor Operation 44
Rotor Detection 44
Parking 44
Automatic Energy Optimization (AEO) 45
Automatic Motor Adaptation (AMA) 45
Running AMA 45
AQ267037536117en-000101/130R00834 | Danfoss A/S © 2023.09
Contents
VLT HVAC Drive FC 102
Operating Guide