■ Running a Job on PSV7000 ◘
PSV7000 Operator’s Manual —15—
back
Running a Job on PSV7000
Requirements
Requirements prior to running a job on PSV7000:
• A task or job for your target device must already exist. This is
generally an administrator function. Refer to TaskLink’s (or
LumenX’s) online Help and Chapter 3 of the Owner’s Manual.
• You need to know the device and Socket Adapter for the target
job, as well as what input and output media is needed.
• Make sure all assemblies needed for the target job, such as the
Dual Tray Feeder, a Marking System or the Tape Output System,
are installed on the PSV7000 Machine. Refer to Chapter 2- Set Up
of the Owner’s Manual for more information.
Operators, please read Safety Messages and Precautions on page 8
through page 12 (if you have not already). You should generally be
familiar with the PSV7000 System.
List of Steps to Start a Job
Operator functions are in chronological order as follows:
1. Checking the System on page 17
2. Installing Input/Output Media on page 18
(See #10 below for Dual Tray Feeder)
3. (Optional) Performing 3D Coplanarity Inspection on page 27
4. (Optional) Set up Other Equipment on page 29
5. Socket Adapters and Actuator Plates on page 30
6. Installing the Correct Probes on page 38
7. If Laser Marking—Installing the Correct Rotor Tips on page 46
8. Turning PSV7000 System Power ON on page 48
9. Selecting a Job—Starting AH700 Indirectly on page 49
10. (Optional) Preselecting Programmers on page 53
(Optional) If a Dual Tray Feeder is installed, see page 74.
11. Setting Media and Options—the Setup Window on page 54
Note: The Package File should already have been taught. If not, see
the on-screen Help or the PSV7000 Owner’s Manual, or your
administrator.
The term
‘PSV7000 System’ gen-
erally refers to the
machine, the program-
mers, optional equipment,
and all the onboard soft-
ware including AH700
(the PSV7000 Applica-
tion) and job manage-
ment software (TaskLink
/LumenX).