Page 32 Installation 90030500B
Site Preparation
Site environment
The location you select for your PortServer II is extremely important for its proper
operation. If it is placed too close to other equipment or in a hostile environment, you
may cause equipment failures or errors that you could otherwise avoid.
Before you begin installation, identify the best location using the following guide-
lines:
• PortServer II generates heat and consequently requires adequate circulation to
maintain its specified operating temperatures. Try to allow at least 12 ft (0.3 M) of
ventilation space above and on all sides. Never cover or obstruct the ventilation
slots provided on the unit.
• Always follow the ESD prevention procedures given later in this chapter when
you work on PortServer II. Damage from static discharge can cause immediate or
intermittent failure.
• Do not position PortServer II close to electrical equipment such as electric motors
or air conditioners. Interference from electrical equipment may cause intermittent
failures.
• Do not install PortServer II in an area where condensation, water, or other liquids
may be present. This may cause a safety hazard and cause failure of the equip-
ment.
• Ensure that the cover is secure and that all cables are firmly in place on comple-
tion of installation. This will reduce safety hazards and eliminate the chance of
failures due to cable disconnection.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Digi PortServer II and is the answer not in the manual?

Digi PortServer II Specifications

General IconGeneral
BrandDigi
ModelPortServer II
CategoryServer
LanguageEnglish

Related product manuals