EasyManua.ls Logo

Dormakaba ED900 - Page 45

Dormakaba ED900
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
45
ED900 02-202008125330
dormakaba ED900 Installation Instructions – Double egress door Chapter 14
.. Install conduit box (option).
TIPS AND RECOMMENDATIONS
 Vac terminal block is secured
to mounting plate by M x 
Phillips head screw.
• Screw must be loosened to
allow conduit box tabs to slide
into mounting plate slots.
• Screw is then threaded into
conduit box mounting hole and
tightened.
. Loosen M x  Phillips head screw.
. Slide conduit box tabs into slots in
bottom of mounting plate until hole in
conduit box lines up with hole in
mounting plate.
. Thread M Phillips head screw into
conduit box mounting hole and tighten
screw.
CAUTION
Terminal block M screw torque.
Tighten M screw to a torque of
 -  in-lb.
• Insure screw is threaded into
conduit box mounting hole.
. Mounting plate assembly is ready for
installation.
Fig. 14.3.5 115 Vac terminal block mounting
Fig. 14.3.6 Conduit box installed on
mounting plate
1 115 VAC terminal
block
2 Ground terminal
5 M3.5 screw
6 115 Vac plug to
operator
L 115 Vac
N Neutral
G Ground
1 115 VAC terminal
block
2 Ground terminal
5 M3.5 screw
6 115 Vac plug to
operator
7 Conduit box
7.1 Conduit box
mounting hole
1
2
5
6
L
N
G
5
6
2
7
7.1
1
2
6
7
1
3
4
5
Fig. 14.3.7 Power cord wiring kit assembly (option)
1 Power cord
3 Cord grip
4 Conduit box
5 120 Vac label

Table of Contents