EasyManua.ls Logo

Dormakaba ED900 - Full Width Cover Option; ED900 Operator Preparation and 19 Mounting Plate Assembly

Dormakaba ED900
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
46
ED900 02-202008125330
dormakaba ED900 Installation Instructions – Double egress door Chapter 14
. Full width cover option –
ED operator preparation and mounting plate assembly
Fig. 14.4.1 ED900 active door operator
TIPS AND RECOMMENDATIONS
Reference Chapter  for active /inactive door
assignments.
TIPS AND RECOMMENDATIONS
Power switch on active door operator will be
replaced with single program switch
(Para. .).
.. Remove terminal board from active door ED.
. Press in  tabs () that secure terminal board () to
ED, lift up terminal board and swing away from
end of housing.
.. Remove ED  Vac plug.
. Swing open upper bracket ().
. Remove ED  Vac plug () from power supply
circuit board socket ().
.. Remove power supply circuit board.
. Remove power supply circuit board () from its slot in
ED.
Fig. 14.4.2 ED900 active door power switch removal
1 Terminal board
2 Tabs
3 Upper bracket
4 Power supply circuit
board
5 ED900 115 Vac plug
1
2
3
3
5
4
6
1
2
2
3
ED900 – Active door
Power switch
Spindle
Program switches

Table of Contents