EasyManua.ls Logo

Dräger Julian - Page 43

Dräger Julian
148 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Display (example):
A check mark () indicates that the respective test point
has been completed successfully.
The clock symbol uu
uu
indicates the test stage is currently
in progress.
The system compliance and the leakage of the breathing
system and breathing circuit are determined by Julian in
the self test.
Depending on the patient circuit used, system
compliance is 5 to 6 mL/cmH2O.
The system will tolerate leaks up to 150 mL/min at
30 cmH2O.
For leaks of more than 150 mL/min:
Check patient circuit and repeat leak test.
After the self test, Julian switches to standby.
Preparation
Checks of Readiness for Operation
Operating Instructions Julian SW 3.n
43
Self-test
electronics
freshgas
mixer
ventilator
system
compliance 5.00 mL/mbar
leakage
16 mL/mbar
cancel
test
72

Table of Contents

Other manuals for Dräger Julian

Related product manuals