38 Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
Locate the top panel trim assemblies and the 12 screws that you removed previously.
Replace the outside pairs of trim screws on the first trim assembly, and then replace the interior trim
screws.
Repeat to install the second trim assembly.
13. Replace the two upper side panels:
Locate the two upper side panels and the key.
Slide the bottom lip of the first panel into the track above the bottom panel.
Push the panel forward until it is flush with the rack frame.
Snap the panel into the latches.
Lock the upper side panels with the key.
Repeat to install the second panel.
14. Five and six UPS preassembled systems only. Continue to section 3.12“Installing the UPS Internal
Batteries .
15. If installing optional EBM(s), continue to section 3.13 “EBM Installation” . Otherwise, go to section 3.16
“Parallel System Initial Startup Section” .
33..1111 BBoottttoomm EEnnttrryy IInnssttaallllaattiioonn
Bottom Entry Installation
Figure 19 shows input and output wiring in a bottom entry system.
Figure 19. Bottom Entry Wiring Installation
Bottom Entry Installation