Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14 61
44..77 IInnssttaalllliinngg tthhee IInnppuutt aanndd OOuuttppuutt WWiirriinngg
Figure 43. Wiring Entry Options
Wiring in a Botto m Entry Rack Wiring in a Top Entry Rack
To install the parallel system input and output wiring:
1. Remove the five screws on the wireway access cover and retain. Remove the cover and retain.
Installing the Input and Output Wiring