Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14 57
CChhaapptteerr 44 SSttaannddaarrdd SSyysstteemm IInnssttaallllaattiioonn
44..11 SSttaannddaarrdd SSyysstteemm IInnssttaallllaattiioonn
For standard systems, the BladeUPS modules are installed in the rack after delivery.
This chapter explains:
Equipment inspection
Required tools
Unpacking the cabinet
Parallel system setup
Extended Battery Module (EBM) setup and installation (optional)
UPS setup and installation, including UPS internal batteries
Parallel installation (optional)
Initial startup
NOTE For instructions on how to install the optional Maintenance Bypass Module (MBM), refer
to the user’s guide for the MBM.
44..22 IInnssppeeccttiinngg tthhee EEqquuiippmmeenntt
If any equipment has been damaged during shipment, keep the shipping cartons and packing materials for the
carrier or place of purchase, and file a claim for shipping damage. If you discover damage after acceptance, file
a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with the carrier within 15 days of receipt of the
equipment; 2) Send a copy of the damage claim within 15 days to your service representative.
NOTE Check the battery recharge date on the shipping carton label. If the date has expired and
the batteries were never recharged, do not use the UPS. Contact your service
representative.
44..33 TToooollss RReeqquuiirreedd
To assemble the components, you may need the following tools:
Medium flat-bladed screwdriver
Short-handled #2 Phillips screwdriver
Long-handled #2 Phillips screwdriver
7 and 8 mm wrench or socket