56 Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
On each UPS, press any button on the front panel display to activate the menu options, and then press
the button until the IDENTIFICATION menu displays. Press the
button to display the identification
data, including the firmware version.
If any firmware versions do not match, install the firmware from the supplied BladeUPS: Documents,
Firmware, and Installation Video CD or visit www.eaton.com/powerquality to download the latest version
and the instructions for installing it.
16. If optional EBMs are installed, see section 5.17 “Configuring the UPS for EBMs” to set the number of
installed EBMs for each UPS.
17. To change any other factory-set defaults, see section 5.1 “Operation”.
NOTE 1 Eaton recommends setting the Date and Time and the Start screen.
NOTE 2 Verify that the Parallel Operation Settings are set appropriately for your system. For
example, if you know the load will exceed the redundancy level of the system, set the
Parallel Operation Mode to “Capacity Mode” to prevent unnecessary alarms (see
“Operation” Section).
18. If you installed an optional REPO, test the REPO function:
Activate the external REPO switch. Verify the status change on the UPS display.
Deactivate the external REPO switch and restart the UPS.
19. See 7.12 Updating the UPS Firmware ”.
NOTE 1 When adding a new UPS to a parallel system or updating one UPS’s firmware, verify
that all UPSs in the parallel system are updated to the same firmware version.
NOTE 2 The batteries charge to 80% capacity in less than 5 hours. However, Eaton
recommends that the batteries charge for 48 hours after installation or if the system is
off for more than 30 days.
Parallel System Initial Startup