EasyManua.ls Logo

Eaton BladeUPS - Page 82

Eaton BladeUPS
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
68 Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
8. Parallel system only. (Optional) Repeat step 1 trough 7 to install each rail kit in the parallel system to
install each rail kit in the parallel system.
NOTE For ease of installation, install all of the rail kits for the parallel system before installing
the UPSs.
CAUTION
The UPS is heavy (see the ‘Specifications” section ) removing the UPS from its carton requires a minimum of
two people. Use the corrugated lifting sling (packaged with the UPS) to move the UPS.
9. Place the UPS on a flat, stable surface with the front of the UPS facing toward you.
10. Remove the electronics module and set it aside :
Remove the electronics module locking screw at the top left of the electronics module and retain. Grasp
the ring handle at the middle of the module and pull the module slowly out of the cabinet. Pull firmly to
unseat the connectors. Use two hands to support the module.
NOTE Treat the electronics module with care to avoid damaging the fans, connectors, or
internal circuitry.
Figure 50. Removing the Electronics Module
Electronics Module
Locking Screw
Ring Handle
11. If the mounting brackets are not already installed, align the two mounting brackets with the screw holes on
the sides of the UPS and secure with the supplied 6-32 flat-head screws.
Rack Setup for the UPS

Table of Contents

Other manuals for Eaton BladeUPS

Related product manuals