2019.04.4
© 2018 Eaton Cummins Automated Transmission Technologies. All rights reserved
99
TRSM0950 Disassembly/Assembly | Main Shaft Disassembly/Assembly
17. Install a magnet on Main Shaft Key to hold the key in
place during final Main Shaft Assembly and installation
into transmission.
Note: Remove magnet from Main Shaft Key after
installation of Main Shaft Assembly onto transmission.
18. Place Main Shaft Assembly horizontally on a clean flat
surface.
CAUTION: Secure Main Shaft Assembly while on flat
surface to avoid unexpected movement. Failure to
properly secure Main Shaft Assembly could result in
component damage and/or personal injury.
19. Install Rail C Sliding Clutch and align the double slot
with Main Shaft Key.