EasyManua.ls Logo

Eaton Endurant - Page 178

Eaton Endurant
248 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2019.04.4
© 2018 Eaton Cummins Automated Transmission Technologies. All rights reserved
175
TRSM0950 Installation | Main Shaft and Countershaft Installation
5. Slowly press down the Synchronizer Sliding Sleeve to
the neutral position and seat the 3 rollers evenly on the
springs and plungers.
6. Install Rail B Synchronizer Ring.
Note: Align the 3 tabs on ring to the 3 openings on the
hub at each spring and plunger.
7. Install Wave Spring - Front.
NOTICE: Wave Spring - Front is taller than the Wave
Spring - Rear.
8. Install Thrust Washer - Front.
9. Install Needle Bearing - Front.

Table of Contents

Related product manuals