EasyManua.ls Logo

Edwards SCU-350 Series

Edwards SCU-350 Series
103 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SCU-350 Series Control Unit for Turbomolecular Pump
MT-21E-201-E
Page 19
3
INSTALLATION
3.6.2 Installation area
CAUTION
The minimum bending radius of the STP connection cable is 150 mm (5.91").
DO NOT bend the cables excessively and beware of any obstacles when installing the SCU-350.
In addition, leave enough space to install other cables without bending them excessively.
When installing the SCU-350, leave enough space for the following (refer to Figure 13):
Space for maintenance and inspection.
Space for inlet and outlet cooling air:
Top and side: 50 mm (1.97") or more.
Bottom: 18 mm (0.71") or more (height of the rubber feet).
Space for connecting the cables:
Rear: 246 mm (9.69") or more.
A. 50 mm (1.97") or more
B. 18 mm (0.71") or more C. 246 mm (9.69") or more
Figure 13 - Installing the SCU-350
C
A
A
A
B

Table of Contents

Related product manuals