Pos: 9.10 /0025 Üb erschriften/E LTRA 1.1 Übersc hriften11 Mai ntenance (20 15-12-03 0 7:57:57) @ 7\ mod_1383121 708299_9.doc x @ 50516 @ 2 @ 1
6.5 Maintenance
Pos: 9.11 /0010 E LTRA/0015 s ervice_instructio ns/CS-2000_s ervice/20 Misc ellaneous_CS-20 00/2025 Mod ul Maintenanc e CS-2000 @ 9\mod_14255 44021010_9.doc x @ 74910 @ @ 1
– Is the furnace closure cone still properly fixed? See chapter “Closing cone”.
– Check whether the imprint of all the O-rings is at least of 2 mm thickness.
– Is the inlet pressure regulator set on 1,5 bar ( 22.5 psi )? See chapter “Pressure
regulators”.
– Is the other two pressure regulator set on 0,35 bar ( 5 psi )?
– Check for leaks. See chapter “Leak checking”.
– Is the gas flow rate correct? See chapter “Gas flow controller”.
– Pressure switch: change over at about 1 bar? Measure across the leads. See chapter
“No or low oxygen pressure”.
– Does the thermostatic control work correctly? See chapter “IR thermostatic control”.
– Check the infrared baseline. See chapter “Infrared base line”.
– Check whether all the screws of the generator housing are tight.
– Check whether all four „high voltage“ stickers are still in place.
– Check whether all plugs in the analyzer are properly plugged in.
– Check whether all the warning labels are still attached to the side-panels.
– Calibration of all measuring ranges.
Pos: 10 /0010 ELTR A/------- Seitenumbruch ----------- @ 6\mod_1368796 429449_0.doc x @ 41468 @ @ 1