54
 
1.  The blade enclosure is a 2U component at the top of the ganged rail. Install the blade    
  enclosure above the Control Stations.
2.  Install the screws holding the blade enclosure in place. Tighten all the screws holding the  
  components into the cabinet.
Two people are required to install the components.
 
CAUTION
Install the blade enclosure
Front
Standby power supply
Disk processor enclosure 
Control Station
Control Station
A
AC
AC
AC
AC
Blade enclosure