EasyManua.ls Logo

EMC VNX5300 - The 3 U, 15 (3.5-inch) DAE Rear View

EMC VNX5300
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
60
A yellow circle with a number indicates the cable number.
Cabling the VNX5300 with two Control Stations.
1. Connect the Control Station 0 (CS0) to the customer modem.
2. Connect Control Station 0 (CS0) IPMI to CS1.
3. Connect CS0 MGMT B extension cable to MGMT CS0.
4. Connect CS1 MGMT B extension cable to MGMT B (optional).
5. Connect CS 0 MGMT extension cable to local area network (LAN).
6. Connect CS1 MGMT B extension cable to LAN (optional).
If Control Station 1 is not installed you will not need CS1 extension cables or cables 2, 4, and 6.
1
2
3
4
5
6
#
Serial
console
MGMT
CS
B
MODEM socket
VGA plug
A
IPMI port
Serial
console
MGMT
CS
B
MODEM socket
VGA plug
A
IPMI port
PDU B
PDU B
2
Control Station 0
Control Station 1 (optional)
B
MGMT
B
MGMT
B
MGMT
B
MGMT
4
6
3
5
CS
1
2
Blade Encl 0
MMB Port 1
3
CS 0 B
Blade Encl 0
MMB Port 2
4
CS 1 B
To public local
area network (LAN)
5
CS0 MGMT
6
CS1 MGMT
Modem
CS0 CS Port
CS1 CS Port
CS1 CS Port
CS0 CS Port
CS 1
optional
Modem
1
CS
CS 1
optional
CS 1
optional
Connect Control Station cables

Table of Contents

Other manuals for EMC VNX5300

Related product manuals