2.5 Installation procedure
Follow these steps for a proper installation:
Procedure
1. Review Mounting Considerations.
See Installation considerations.
2. Mount the Rosemount 2410 Tank Hub.
See Mechanical installation.
3. Wire the Rosemount 2410.
See Electrical installation.
4. Make sure covers and cable/conduit connections are tight.
5. Power up the Rosemount 2410.
6. Configure the Rosemount 2410 (Configuration):
• tank database
• tags
• integral display
• Primary/Secondary Bus
• Relay output
• Hybrid density
7. Verify operation.
8. Optional: Enable the Write Protection switch if required.
Reference Manual Overview
00809-0100-2410 December 2019
Rosemount 2410 Tank Hub 23