EasyManuals Logo

Emtek P100 User Manual

Emtek P100
73 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
P100 USERS MANUAL JUN2014v03
16
3.2.3.1 Loading the Carrying Case
GENERAL: Place the components in the carry case at the designated locations depicted below (Fig. 1).
NOTES:
1) The printer power supply/charger, and Ethernt to RJ11 cable should be placed in the lower slot,
before the printer is put in place, as shown in the images to the left of the case.
2) The P100 power cord, for the P100 power supply/charger, should be placed in the P100 Charger
opening, and then the power supply/charger block, as shown in the images to the right of the case.
3) Assure the P100 is powered off before closing the carrying case lid!
Fig. 1 - P100 Component Placement
P100
Extra Inlet
Cover
Horizontal
Inlet (& Inlet
Adapter)
-Printer
-PWR supply
-Ethernet to
RJ11 Cable
P100
Charger
Label Rolls
USB
Drive
Calibration Report

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Emtek P100 and is the answer not in the manual?

Emtek P100 Specifications

General IconGeneral
BrandEmtek
ModelP100
CategoryMeasuring Instruments
LanguageEnglish