Proline Promass F 500 Modbus RS485 Installation
Endress+Hauser 31
1
1
2
2
1
1
5 (0.2) min. 15 (0.6)
SW 2.5
M3
A0029799
1 Cover borehole for the securing screw
2 Securing screw to lock the cover
6.2 Mounting the measuring device
6.2.1 Required tools
For transmitter
For mounting on a post:
• Proline 500 – digital transmitter
– Open-ended wrench AF 10
– Torx screwdriver TX 25
• Proline 500 transmitter
Open-ended wrench AF 13
For wall mounting:
Drill with drill bit ⌀ 6.0 mm
For sensor
For flanges and other process connections: Corresponding mounting tools
6.2.2 Preparing the measuring device
1. Remove all remaining transport packaging.
2. Remove any protective covers or protective caps present from the sensor.
3. Remove stick-on label on the electronics compartment cover.
6.2.3 Mounting the measuring device
L
WARNING
Danger due to improper process sealing!
‣
Ensure that the inside diameters of the gaskets are greater than or equal to that of the
process connections and piping.
‣
Ensure that the gaskets are clean and undamaged.
‣
Install the gaskets correctly.
1. Ensure that the direction of the arrow on the nameplate of the sensor matches the
flow direction of the fluid.