46
Initial Installation
QUALIFIED INSTALLERS ONLY
PeDestaL instaLLation
PoLe PeDestaL (50-4072 / 50-4078)
Figure 72: Leveling Leg Removal
The pedestal MUST be anchored to the floor.
*Note: If planning to reroute the electrical and
gas connections through the pedestal, complete
the steps in section
ReLocating gas/eLectRicaL
on page 48 before proceding.
The pedestal comes packaged with rigid foam to help
secure and cushion it during transportation. To aid with
the pedestal installation, save this foam as it can be
used as a cushion for the unit.
Remove the 3 straps securing the unit to the pallet. Lay
the foam behind the pallet and tip the unit back onto
the cushion so there is easy access to its bottom.
Remove the four (4) leveling legs from the bottom of
the unit (see Figure 72). These levelling legs will be
reinstalled on the pedestal.
Figure 73: Pole Pedestal Leveling Feet
Take the leveling legs that were removed from the unit and install them on the pole pedestal (see Figure
73).
The pole pedestal comes packaged with four (4) hex head bolts and four (4) washers used to secure the
pedestal onto the unit. Align the pedestal vent slots with those on the bottom of the unit. Fasten the pole
pedestal to the unit using the same threaded holes that the leveling legs were installed in (see Figure 74).
*Note: If rerouting the Gas/Electrical connections through the pedestal, make sure to complete the reloca-
tion prior to fully installing the pedestal.
Raise the unit upright.
Figure 74: Pole Pedestal Installation