MPC-6000 / MPC-7000 / RND-2 PROGRAMMING MANUAL
36
Configuring the City Tie Activation
Setting the System Reporting Type must be selected before configuring the City Tie
activation. See page 36. The City Tie, once installed, may be activated by a trouble, a
supervisory or both.
Action
1. Select “Edit”.
2. Select “Manual Pgm”.
3. Use “Cmor”
and select
“Sys Params”.
4. Select
“CityTrbActvn”.
5. Use the screen to select which activation is
required and press “Bsav”.
Setting Trouble Ack Required
Troubles and supervisory events are normally self-restoring; however, if it is required
that they need to be acknowledged before clearing, follow the procedure below:
Action
1. Select “Edit”.
2. Select “Manual Pgm”.
3. Use “Cmor”
and select
“Sys Params”.
4. Select “Trb Ack Req”.
5. Press 1 for yes and then press “Bsav”.
Setting the System Reporting Type
Depending on the type of system configured, the panel will report power failure in
different periods of time. (No reporting for Local, Auxiliary, 6 hours for Central Station
and 15 hours for Remote Station.)
Action
1. Select “Edit”.
2. Select “Manual Pgm”.
3. Use “Cmor”
and select
“Sys Params”.
4. Select “System Type”.
5. Use the screen to select which system type is
required and press “Bsav”.
Copying the Primary to the Backup
Once the primary configuration has been checked out and is running correctly, it is a
good idea to copy the configuration into the backup. This is accomplished as follows:
Action Result
1. Select “Edit”.
2. Select “Copy Primary”.
3. Select “Cyes” to start the copy. The screen will indicate the copy is in progress.
It will take several minutes.