© Festo Didactic 655633 83
The stations of the MPS
are generally delivered
completely assembled
operationally adjusted as single station
commissioned
tested
Note
If stations are combined changes of the mechanical set-up and the position and
setting of sensors may be necessary.
The commissioning is normally limited to a visual check to ensure correct tubing
connections / wiring and supply of operating voltage.
All components, tubing and wiring is clearly marked so that all connections can be
easily re-established.
The following is required to commission the MPS
station:
The assembled and adjusted MPS
station
A control console
A PLC board
A power supply unit 24 V DC, 4.5 A
A compressed air supply of 4 bar (400 kPa), approx. suction capacity of 50 l/min
A PC with installed PLC programming software
6. Commissioning