installed and used according to the recommendations of the
manufacturer.
Failure to follow these instructions could result in property damage,
bodily injury, or death. All boilers must be installed in accordance with
national, state, and local plumbing, heating, and electrical codes and the
regulations of the serving electric, water, and gas utilities. Contact local
building or fire officials before installation about restrictions and
installation inspection requirements in your area. This boiler is safety
tested and listed. The P4 pellet boiler does not carry an ASME stamp.
The instructions in this manual and in supporting documentation
(additional instructions, diagrams, and component information provided
by Tarm Biomass) must be followed. If the instructions are in conflict
with local code requirements, the local code requirements will prevail.
When in doubt, contact your dealer or Tarm Biomass. The manual and
supporting documentation must be retained by the owner/ system
operator for reference and future use.
The installer is responsible for familiarizing the owner/ system operator
with all aspects of boiler operations, safety procedures, monitoring and
cleaning requirements, shut down procedures, and annual maintenance
requirements.