XSCF>
showboards
-p
0
PSB

PPAR-ID(LSB)
Assignment

Pwr

Conn
Conf
Test

Fault
----
------------
-----------
----
----
----
-------
--------
00-0
00(00)

Assigned

y

y

y

Passed

Normal
01-0
SP

Available

n

n

n

Unknown
Normal
XSCF>
addboard
-c
configure
-p
0
01-0
PSB#01-0
will
be
configured
into
PPAR-ID
0.
Continue?[y|n]
:
y
Start
connecting
PSB
to
PPAR.
[3600sec]

0.....
30.....
60.....
90.....120.....150.....180.....210.....240.....
270.....300.....330.....360.....390.....420.....450.....480.....510.....
540.....570.....600.....630.....660.....690.....720.....750.....780.....
810.....840.....870.....900.....930.....960.....end
Connected
PSB
to
PPAR.
Start
configuring
PSB
to
Logical
Domains
(LDoms)
Manager.
[1800sec]
0.....end
Configured
PSB
to
Logical
Domains
(LDoms)
Manager.
Operation
has
completed.
Note
-
Incorporation
of
a
system
board
(PSB)
with
the
addboard
command
also
incorporates
the
targeted
hardware
resources
on
the
system
board
(PSB)
into
the
physical
partition
after
a
hardware
diagnosis
is
performed.
Therefore,
command
execution
may
take
some
time
to
complete.
XSCF>
showresult
0
the
system
board
(PSB)
status.
In
the
following
example,
system
board
01-0
is
in
the
system
board
pool.
b
.
Execute
the
addboard
-c
configure
command
to
incorporate
the
system
board
(PSB)
into
the
physical
partition.
The
following
example
incorporates
system
board
01-0
into
physical
partition
0.
c.
Execute
the
showre sult
command
to
confirm
the
end
statu s
of
the
previously
executed
addboard
command.
In
the
following
example,
0
is
returned
as
the
end
status,
so
the
execution
of
the
addboard
command
has
completed
correctly.
d.
Execute
the
showboards
command
to
check
the
system
board
(PSB)
status.
Confirm
that
the
added
system
board
(PSB)
is
in
the
"Assigned"
state
and
"y"
is
displayed
for
all
of
the
[Pwr],
[Conn],
and
[Conf]
columns.
In
the
following
example,
since
both
the
[Conn]
and
[Conf]
fields
display
"y"
for
system
board
01-0,
the
system
board
(PSB)
has
been
added
correctly.
Chapter
9
 
Installing
a
System
with
a
Building
Block
Configuration 249

Table of Contents

Other manuals for Fujitsu M10

Related product manuals