TX100 S2 Service Supplement 31
Replacement routines
4.1.3.2 Installing the front bezel
Ê Thread the system board connector on the front panel cable through the 
recess in the chassis front.
Ê From inside the server, carefully pull the front panel cable into the chassis.
Figure 10: Installing the front bezel
Ê Hook the three tabs on the front bezel into the notches in the chassis (1).
Ê Carefully close the front bezel. Make sure that all three locking latches 
properly engage (2).