RB-RBC-IOMM-2015-1
Fulton Ltd
Page 27
MAINTENANCE - 4
CAUTION
It is vitally important that the instructions given in this manual are strictly adhered to.
Failure to carry out the daily, weekly, monthly and six monthly checks could result in a drastic
reduction in the life expectancy of the boiler.
SECTION 4 - MAINTENANCE
Tests should be carried out by a competent person trained to perform such tests. If any test shows that the
equipment is not operating correctly, the fault should be investigated and corrected before the boiler is used.
Anyrecticationorrepairsshouldbecarriedoutbytrained,competentservicepersonnel.
The platforms are mounted to the boiler base frame. They are designed to allow easy
maintenance access to the components on the top of the boiler
(i.e. the water level probes, main steam valve, vent and safety valves).
It is the responsibility of the user to ensure that a site risk assessment is carried out for the safe
use of the ladders and working at height on the platform.
4.1 BOILER PLATFORM (IF FITTED)
Figure. 18 - Typical Boiler Platform