RB-RBC-IOMM-2015-1
Fulton Ltd
Page 45
MAINTENANCE - 4
It is a requirement of the Factories Act and Pressure Systems Regulations (UK only) that the
boilerisinternallyinspectedandre-certiedatnotmorethan14monthintervals.
It is normal practice to carry out an annual service during which your insurance surveyor would
attend to carry out the statutory inspection. The scope of a full insurance strip-down is such that
it should only be attempted by persons competent to do so who have had the necessary training,
and have the required test equipment. Fulton Ltd can offer this service if required.
Theengineeringsurveyormayrequiretheremovaloftheceramicbreinsulationaroundthe
periphery of the front tube plate to facilitate inspection of the shell to tube plate weld.
ThestandardFultonservicekitincludesreplacementceramicbrematerialwhichmustbeglued
inplacewiththeadhesivesupplied.Itisvitalthematerialisttedensuringtheendsofthebre
face into the centre of the boiler.
Forburnermaintenance,refertotheburnermanufacturer’sInstallationandMaintenance
instructions.
4.11.5 ANNUALLY IN ADDITION