EasyManua.ls Logo

GE Baker Hughes PanaFlow LC XMT1000 - Page 118

GE Baker Hughes PanaFlow LC XMT1000
190 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix B. Using the Clamping Fixtures
104 PanaFlow™ LC User’s Manual
Figure 89: UCF Setup, Odd Traverse, Step 5
6. From the other mark on the top of the pipe, measure around the pipe in the opposite direction a
distance equal to 1/4 of the pipe circumference, or the same distance used in Step 5. Use the center
punch to make a mark at this point.
Figure 90: UCF Setup, Odd Traverse, Step 6
7. Center the long block over one of the center punch marks on the side of the pipe. Align the long block
so that the pressure bolt is directly over the punch mark. Fasten the block to the pipe by wrapping
both chains around the pipe and fastening the chains to the screw hooks on the opposite side of the
block.
Figure 91: UCF Setup, Odd Traverse, Step 7

Table of Contents

Related product manuals