P44x/EN CM/Hb
MiCOM P40 Agile P442, P444
(CM) 9-
Note 1: Check the measurement reference (ref. angle of phase shift) in:
"Measurt set up/Measurement ref." (VA by default).
Monitoring can also be selected to poll the network parameters (I/U/P/Q/f…)
Note 2: In LCD: IN=3I0
After this step, the errors on the phase sequences, ratios of CT, VT and wiring
(analogue input only) will be detected.
Note 3: See connections drawing
Note 4: See LCD structure in test tools