P
44x/EN ST/Hb6
Setting
(ST) 4
-22 MiCOM P40 Agile
P442, P444
Menu text Default setting
Setting range
Step size
Min Max
GROUP 1: POWER SWING
IN > (% Imax) 40% 10% 100% 1%
Residual current threshold for power swing unblocking. It is a percentage of the highest
measured current on any phase.
Typical setting: 40%
Minimum setting (to avoid maloperation for asymmetric in power swing currents): > 30%
Maximum setting (to ensure unblocking for line faults): < 100%
I2 > Status Enabled Disabled or Enabled
Negative Sequence current power swing unblocking criteria activation:
Enables or disables the phase-phase fault protection during Power Swing Blocking. When
enabled, the relay will trip when I
2
> ‘I2 > (% Imax)’ or when I
2
< 0.1 × In.
I2 > (% Imax) 30% 10% 100% 1%
Negative Sequence current threshold for power swing unblocking. It is a percentage of the
highest measured current on any phase.
Typical setting: 30%
Minimum setting (to avoid maloperation for asymmetric in power swing currents): > 10%
Maximum setting (to ensure unblocking for line faults): < 50%
Imax line > Status Enabled Disabled or Enabled
Phase current power swing unblocking criteria activation:
Enables or disables the three-phase fault protection during Power Swing Blocking. When
enabled, the relay will trip when phase current threeshold exceeds Imax line >.
Imax line > 3 x In 1 x In 20 x In 0.01 x In
Phase current threshold for power swing unblocking (unit:A)
Minimum setting: 1.2 × [ maximum power swing current ]
Maximum setting: 0.8 × [ minimum phase fault current level ]
Delta I Status Enabled Disabled or Enabled
Delta I criterion status activation:
Enables or disables the unblocking logic three-phase fault protection during Power Swing
Blocking. Time delay is settable.
Unblocking Time delay 30s 0 30s 0.1s
Time-delay after which blocking criteria is automatically removed. Typical setting:
30s if a near permanent block is required,
2s if unblocking is required to split the system.
Blocking Zones 00000000 Bit 0: Z1/Z1X Block, Bit 1: Z2 Block,
Bit 2: Zp Block, Bit 3: Zq Block, Bit 4: Z3
Block, Bit 5: Z4 Block
Allow zone blocking in case of a power swing.
The Blocked Zones function bits are set to 1 to block zone tripping or are set to 0 to allow
tripping as normal.
When the criteria for power swing detection are met (3 single phase loop inside the quad &
crossing the R band in less than 5
ms in a 50 Hz network), and when out of step tripping is
selected, then the distance protection with all of its stages is blocked
to prevent tripping by
the distance protection (the relay can operate normally for any fault occurring during a
power swing as there are different criteria which can be used by monitoring current & delta
current).
Out of Step 1 1 255 1
Threshold of number of out of steps. Triggers DDB #352 when reached.
Setting of the number of steps to confirm Out Of Step (OOS) condition.