GMC-I Messtechnik GmbH 65
❑ Suppressing Test Steps
Depending on the selected test standard, some of the following
test steps can be suppressed:
1
Before switching line voltage to the device under test, a short-circuit test is con-
ducted regardless of this setting.
❑ Setting Measuring Parameters for Individual Test Steps
Depending on the selected test standard, some of the following
test steps can be selected:
1
SECUTEST BASE10/PRO (feature G01)
2
SECULIFE ST BASE25 (feature G02)
❑
Select between single and multiple measurement for individual test steps
Other parameters
Open-circuit voltage
(IEC 60974-4)
Open-circuit voltage at welding unit
on: activate
off: deactivate
Supply voltage PC III
(VDE 0701-0702)
Supply voltage measurement
(with PCIII DUTs, for measurement type “Active” only)
on: activate
off: deactivate
Testing of extension cords – additional parameters (VDE 0701-0702-VLTG)
Continuity test Testing of conductors (L, N, PE) for continuity with the
help of the EL1/VL2E/AT3-IIIE adapter
on: activate
off: deactivate
Testing of PRCDs – additional parameters (VDE 0701-0702-PRCD)
RPE IP (standard PRCD) Protective conductor resistance test with standard
PRCDs: Select test current IP: ±200 mA= / 200 mA~ /
Feature G01: 10 A~ / feature G02: 25 A~
Varistor test PRCD-K Varistor test at type K PRCDs:
on: activate
off: deactivate
Sensor surface test Testing of the sensor surface of the PRCD:
on: activate
off: deactivate
Man. tripping test Manual tripping of the PRCD:
on: activate
off: deactivate
Time to trip Tripping of the PRCD after xx seconds:
on: activate
off: deactivate
Sequence Parameter Meaning
Parameter Suppressible test steps
Visual inspection (1) Visual inspection, standard
Visual inspection 2 Visual inspection, function test, welding units
Function test Function test
RPE Protective conductor resistance test
RINS PCI+II Insulation resistance tests for PCI and PCII
RINS pri./sec. Insulation resistance test between the primary and sec-
ondary sides of PCIII DUTs
RINS sec./PE Insulation resistance test between the secondary side and
PE of PCIII DUTs
RINS BF/CF
(IEC 62353)
Insulation resistance tests at BF/CF application parts
RINS welding circuit
(IEC 60974-4)
RINS tests between the primary side and the welding out-
put, as well as between PE and the welding output
Reverse polarity All leakage current measurements with reversed polarity
IPE measurement type
(active)
Protective conductor current test
IT
Touch current test
IT welding circuit
Touch current test at welding circuit
Display test instructions
Test instructions which are not necessarily required for experi-
enced inspectors
Short-circuit test L-N Short-circuit test between L and N
1
Short-circuit test LN-PE Short-circuit test between LN and PE1
1
Open-circuit voltage
(IEC 60974-4)
Open-circuit voltage at welding unit
Continuity Test
(VLTG test only)
Continuity test with EL1/VL2E/AT3-IIIE adapter
PCIII supply voltage Supply voltage measurement (with PCIII DUTs, for mea-
surement type “Active” only)
Parameter Meaning
RPE IP Select test circuit for protective conductor resistance test:
200 mA AC, ±200 mA DC, 10 A AC
1
or 25 A AC
2
IPE measurement type
(active)
Set measurement type of the protective conductor current
measurement for the active device test (differential/direct)
IE measurement type
(active)
(IEC 62353)
Set measurement type of the device leakage current mea-
surement for the active device test (differential/direct)
Parameter
(as of FW1.5.0)
Meaning
RPE as
Switch the “protective conductor resistance” test step back
and forth between multiple and single measurement
Parameter
(as of FW1.8.0)
Meaning
RINS PC II as Switch back and forth between multiple and individual
measurement for the insulation resistance measurement
at PC II parts (measurements at application parts and
welding outputs are not affected)
IT as switch back and forth between multiple and individual
measurement for the touch current measurement
IT PC II as (IEC 60974 only) switch back and forth between multiple
and individual measurement for touch current measure-
ment at PC II parts