45
M_LS900 XP IQ Energy_EN_B
Connections - Installation
Switching on the machine
Always switch on the chiller before the machine (only for ENERGY machines).
Check that the water cooling circuit is operating properly. Check that water cannot leak
onto the electronic components of the machine.
1. Place the switch in the "I" position (On).
The screens must follow on from one another:
L01 SETUP
FPGA X.X
<< GRAVOGRAPH >>
FPGA X.XX
LCD SOFT X.XX
32 Mo BOOT X.XX
<READY TO RECEIVE >
The machine is ready for operation.
Donotloadlesuntilthedisplaysays"Readytoreceive".Thiscouldcauseincorrect
loadingofthele.Loadingadamagedlecouldcauseincorrectlaseremission,which
could damage the engraving machine.
Resolution of the problems
If the machine does not switch on:
• Checkthatthepowercordiscorrectlypluggedintoboththemachineandthepowersupply.
• Checkthatthereispowertothemainsplug.