Operating Instructions • AT2000 CPK • 07-2019 • v03 • 106-29004
Design and function
9
3 Design and function
3.1 Overview of the device
3.1.1 Scope of supply
Data Signal Power
Power p ack CPK
187 2
3456
1 AT2000 CPK
2 Case, complete with 2 keys
3 Safety instructions CPK and short guide CPK
4 USB connecting cable A/B (separate delivery)
5 Connecting cable for connecting power pack and AT2000 CPK
6 power pack CPK (separate delivery)
7 Power cord (separate delivery)
8 Tie advancer
3.1.2 Serial number
1
Serial number 1 is inside the AT2000 CPK. It is visible
when the gate is open.
3.1.3 Checking scope of supply
f Check that nothing is missing and that there are no
visible signs of damage in transit or other damage. Have
damage confirmed by the freight forwarder and notify
HellermannTyton immediately in writing.