EasyManua.ls Logo

Hologic SecurView DX - 2.1 QC Procedures for the Medical Physicist

Hologic SecurView DX
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SecurView DX Workstation V12.0 Quality Control Manual
Chapter 2: QC Activities for the Medical Physicist
Page 6 MAN-09466 Revision 001
2.1 QC Procedures for the Medical Physicist
Hologic recommends that a Medical Physicist check the performance of each SecurView
diagnostic workstation display at least once per year using the procedure given below.
Use the display QC software (QAWeb) provided with each SecurView workstation. For
detailed instructions on using the software, refer to section Testing the Displays
on
page 13.
To run the annual QC check, do the following:
1. Check performance records. For each diagnostic workstation, review the
Appendix B:
SecurView Weekly QC Form for Radiologic Technologists on page 43 or alternative QC
tracking documentation in use per local policy. Verify that the SecurView displays
have been operating within the recommended tolerance limits.
2. Review Hologic Compliance Test results. Using the QC software, check the results
of the most recent Hologic Compliance Test. If the test has not been run during the
last week, then run the test.
3. Verify results. Ensure that the Hologic Compliance or Mammography Compliance
Test results are within the recommended tolerance limits.
a. For each display, check:
White level
DICOM GSDF compliance (Luminance Response).
b. If the results do not meet specifications, refer to section Corrective Action on page 7
.
4. Record the results in the following form(s):
Appendix A: SecurView Annual QC Form for Medical Physicists on page 41
Appendix B: SecurView Weekly QC Form for Radiologic Technologists on page 43
5. For Selenia
®
Dimensions
®
systems:
a. At the Acquisition Workstation, select Admin > Quality Control > Physicist tab
> Diagnostic Review Workstation Quality Control.
b. Select Mark Completed to label the status of this procedure as finished.
c. To mark the QC procedure as completed, select Yes.

Table of Contents

Other manuals for Hologic SecurView DX

Related product manuals