EasyManua.ls Logo

HP ProLiant DL380 G3 - Preparation Procedures; Extending the Server from the Rack

HP ProLiant DL380 G3
115 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removal and Replacement Procedures 21
The system is now without power.
Removing the Server from the Rack
To remove the server from a Compaq branded, Telco, or third-party rack:
1. Power down the server ("Powering Down the Server" on page 20).
2. Loosen the front panel thumbscrews that secure the server faceplate to the
front of the rack.
3. Disconnect the cabling and remove the server from the rack. Reverse the
server installation steps in the documentation that ships with the rack-
mounting option.
4. Place the server on a sturdy, level surface.
Removing the Access Panel
WARNING: To reduce the risk of personal injury from hot
surfaces, allow the drives and the internal system components to
cool before touching them.
CAUTION: Do not operate the server for long periods without
the access panel. Operating the server without the access panel results
in improper airflow and improper cooling that can lead to thermal
damage.
1. Power down the server if performing a non-hot-plug installation or
maintenance procedure ("Powering Down the Server" on page 20).
2. Extend the server from the rack, if applicable ("Extending the Server from
the Rack" on page 18).
3. Lift up on the hood latch handle and remove the access panel.
Hot-Plug SCSI Hard Drive
To remove the component:
HP CONFIDENTIAL
File Name: 291916-3.doc Last Saved On: 5/19/03 10:29 AM

Table of Contents

Other manuals for HP ProLiant DL380 G3

Related product manuals