11. Install the rubber stoppers in the new locations to secure the PEM nuts in the M.2 riser.
12. Install the M.2 SSDs on the M.2 riser board (Installing the M.2 SSDs on page 59).
13. Install the M.2 riser board and the M.2 interposer board on the left DIMM baffle (Installing the M.2
riser board and M.2 interposer board on page 57).
14. Install the left DIMM baffle.
See Install the DIMM baffles on page 25.
15. Install the access panel on page 23.
16. Install the server blade on page 42.
17. Power up the server blade on page 21.
30 Operations