EasyManua.ls Logo

HPE ProLiant DL380 Gen10 Plus - Installing a Secondary Riser Cage

HPE ProLiant DL380 Gen10 Plus
315 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing a secondary riser cageInstalling a secondary riser cage
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have the following items available:
The components included with the hardware option kit
T-10 Torx screwdriver
ProcedureProcedure
1. Observe the following alert:
CAUTION:CAUTION: To prevent damage to the server or expansion boards, power down the server and remove all AC power
cords before removing or installing the PCI riser cage.
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Do one of the following:
Extend the server from the rack .
Remove the server from the rack .
5. Remove the access panel .
6. Remove the rear wall blank.
7. Install any expansion boards, if needed .
8. Install the riser cage:
Installing a secondary riser cage 142

Table of Contents

Related product manuals