Preparing the Preparing the serverserver for operation for operation
ProcedureProcedure
1. Install any options or cables previously removed to access the TPM connector.
2. Install the access panel.
3. Do one of the following:
Slide or install the server into the rack.
Install the server into the enclosure.
4. Power up the server.
a. Connect the power cords (rack and tower servers).
b. Press the Power On/Standby button.