Installing a midplane drive cageInstalling a midplane drive cage
PrerequisitesPrerequisites
Before you perform this procedure, make sure that the components included with the hardware option kit are available.
About this taskAbout this task
Observe the following:
A 1U heatsink is required for each processor when installing this option.
If you have a TPM, install it prior to this option.
If you have a type-a controller, install it prior to this option.
ProcedureProcedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
Extend the server from the rack .
Remove the server from the rack .
4. Remove the access panel .
5. Remove the air baffle .
The air baffle is no longer needed. The drive cage acts as an air baffle for the server.
6. Remove all riser cages.