EasyManua.ls Logo

HPE ProLiant ML30 Gen10 Plus

HPE ProLiant ML30 Gen10 Plus
185 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16. Remove the system board screws (callout 1), and then remove the system board (callout 2).
Installing the system boardInstalling the system board
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have the following items available:
T-15 Torx screwdriver
1.0 gm (0.5 ml) or two 0.5 gm (0.25 ml) of thermal grease
HPE ProLiant ML30 Gen10 Plus Server Maintenance and Service Guide 126

Table of Contents

Related product manuals